Kestrel Energy Storage

Kestrel Energy Storage is a proposed national-scale energy storage project being developed by ESB, Bord Gáis Energy and dCarbonX.
Learn more about the project

Securing Ireland’s Energy

Kestrel restores indigenous, long-duration energy storage, strengthening resilience against supply disruption, price volatility and system stress.
Why It Matters

Enabling Ireland’s Energy Transition

Kestrel provides long-duration storage for today’s energy system, with infrastructure designed for future green hydrogen or biomethane storage.
Why It Matters

Kestrel is a national-scale energy storage project designed to strengthen Ireland’s energy security and support the transition to a lower-carbon energy system. 

 

Led by ESB Generation and Trading, Bord Gáis Energy and dCarbonX, the project would repurpose the decommissioned Ballycotton gas field for secure underground storage. 

 

In the near term, Kestrel would provide strategic natural gas storage, helping protect Ireland from supply disruption, price volatility and wider system stress. Over time, the same infrastructure would transition to support green hydrogen or biomethane, enabling greater renewable energy integration while maintaining a secure and reliable energy system. 

Key facts

No domestic gas storage

Ireland currently has 0 days of gas storage, compared with an EU average of around 90 days. The UK has 6 days of storage.

Proven infrastructure

Natural gas was safely stored in Kinsale from 2001–2017. Underground gas storage in depleted gas fields is a proven infrastructure model used internationally to support energy security and system resilience.

90 days of reserve

Updated geological and operational analysis of the Kestrel project confirm capacity for at least 90 days of strategic reserve, based on average daily consumption.

UK import reliance

Ireland currently imports around 80% of its natural gas via two interconnectors from the UK. As indigenous production from Corrib continues to decline, that reliance is expected to increase, leaving Ireland increasingly exposed to external supply disruption, price volatility and system stress.

€4.6bn per month risk

CEPA modelling estimates €4.6 billion per month economic loss to the Irish economy from a full gas disruption.

Hydrogen-ready

Kestrel Energy Storage is being designed with future green hydrogen and biomethane storage in mind, allowing the infrastructure to evolve as Ireland’s renewable gas sector develops.

Lorem ipsum

Latest news

News item title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Link ->
News item title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Link ->
News item title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Link ->

Learn more about Kestrel